EDF Gravelines - Structural reinforcement section 3

France, Energy (Conventional / Nuclear / Renewables)

Project: EDF Gravelines - Structural reinforcement section 3
Owner: EDF
Executing Company: KAEFER WANNER SAS
Services Executed: Scaffolding
Time frame: 2020

EDF's Gravelines power station is located on the North Sea coast, at an equal distance from Dunkirk and Calais. It is the largest nuclear power plant in Western Europe, both in terms of production capacity and number of reactors. KAEFER WANNER is executing scaffolding works with a dimension of 28m in length, 14m in width and 34m in height. A total of 200 tons of material are being moved.