Crude Flexibility Project

United Arab Emirates, Oil & Gas Onshore

Project: Crude Flexibility Project
Owner: ADNOC Refining, Ruwais
Client: SAMSUNG ENGINEERING
Executing Company: KAEFER LLC
Services Executed: Hot Insulation, Scaffolding
Man-hours: 928,000*
Time frame: 2020 - 2021

The Crude Flexibility Project is an ongoing mega project in the United Arab Emirates. KAEFER's activities are located in two regions, the Green Field and the Brown Field. As the pipelines are placed on pipe racks, almost 80% of the scope of work involves straight lines, with lesser numbers of fittings. The KAEFER team is carrying out 169,000m2 of hot insulation including prior scaffolding works required (volume of 74,000m3).

*total hours until 2020