Man-hours: 93,500
Time frame: 2019 - 2020

The Cameron LNG liquefaction export project is a €8 billion facility with a projected export capability of 12 million tones p.a. Phase 1 includes three trains and all three trains have been producing LNG since May 2020. KAEFER performed the fabrication, installation and insulation of the valve and flange boxes for train 2 and train 3.